Silicon Valley by the Numbers · Housing elements
Housing elements.
City by city.
Every California city and county must keep a housing element, the housing chapter of its general plan, and HCD reviews each one. This page reports HCD’s own labels and dates for the 20 Silicon Valley cities and towns. The homes each city must plan for are on the housing targets page. It does not grade any city and it is not legal advice.
See the numbers ↓On this page
- Where does each city stand on its housing element?
- How long after the due date is the HCD review date on each record?
- How many places carry each label?
- Then and now. Due date against today’s file.
- Which cities hold a Prohousing Designation?
- What is a housing element. And what does “In” mean?
- How we measured
- Common questions
The short answer
As of November 2026, all 20 Silicon Valley cities and towns on this page carry the compliance status “In” in the Housing Element Compliance Report of the California Department of Housing and Community Development (HCD), file updated November 20, 2026. HCD’s January 12, 2022 letter to the Bay Area’s regional planning agency gives January 31, 2023 as the date for local governments to address their 2023 to 2031 housing element. Four of the 20 hold an approved Prohousing Designation in HCD’s tracker, as of August 2026.
01 · status by city
Where does each city stand
on its housing element?
All 20 show “In” for both review status and compliance status in HCD’s file updated November 20, 2026.
HCD’s file holds one record per city or county, the latest document HCD has for it. For 19 of the 20 places that is an adopted element. For Portola Valley it is a “Subsequent Draft” received July 16, 2026 and reviewed September 14, 2026; its compliance status reads “In”.
“Received” is the date HCD received the document; “reviewed” is the date HCD completed its review. The file gives no council adoption date. Every record is coded to the Association of Bay Area Governments (ABAG) region, 6th cycle, planning period 6S.
| City or town | County | Record type | HCD received | Review status | HCD reviewed | Compliance status |
|---|---|---|---|---|---|---|
| Atherton | San Mateo | Adopted | March 6, 2025 | In | May 5, 2025 | In |
| Belmont | San Mateo | Adopted | September 11, 2024 | In | October 16, 2024 | In |
| Cupertino | Santa Clara | Adopted | July 12, 2024 | In | September 4, 2024 | In |
| Foster City | San Mateo | Adopted | March 21, 2024 | In | April 18, 2024 | In |
| Hillsborough | San Mateo | Adopted | February 1, 2024 | In | March 28, 2024 | In |
| Los Altos | Santa Clara | Adopted | August 18, 2023 | In | September 5, 2023 | In |
| Los Altos Hills | Santa Clara | Adopted | December 12, 2025 | In | February 10, 2026 | In |
| Los Gatos | Santa Clara | Adopted | June 6, 2024 | In | July 10, 2024 | In |
| Menlo Park | San Mateo | Adopted | January 24, 2024 | In | March 20, 2024 | In |
| Monte Sereno | Santa Clara | Adopted | May 13, 2024 | In | July 5, 2024 | In |
| Mountain View | Santa Clara | Adopted | April 26, 2023 | In | May 26, 2023 | In |
| Palo Alto | Santa Clara | Adopted | July 26, 2024 | In | August 20, 2024 | In |
| Portola Valley | San Mateo | Subsequent Draft | July 16, 2026 | In | September 14, 2026 | In |
| Redwood City | San Mateo | Adopted | February 22, 2023 | In | March 27, 2023 | In |
| San Jose | Santa Clara | Adopted | November 30, 2023 | In | January 29, 2024 | In |
| San Mateo | San Mateo | Adopted | April 7, 2026 | In | June 1, 2026 | In |
| Santa Clara | Santa Clara | Adopted | December 19, 2025 | In | February 10, 2026 | In |
| Saratoga | Santa Clara | Adopted | July 5, 2024 | In | July 8, 2024 | In |
| Sunnyvale | Santa Clara | Adopted | February 29, 2024 | In | March 6, 2024 | In |
| Woodside | San Mateo | Adopted | January 15, 2025 | In | January 29, 2025 | In |
Source: California Department of Housing and Community Development (HCD).
Property Nerd note. If a city adopted an amended element after an earlier HCD finding, the dates here belong to the later document, and the earlier finding is not in the file.
02 · dates
How long after the due date
is the HCD review date on each record?
From 1.8 months (Redwood City) to 40.0 months (San Mateo), counting from January 31, 2023 to the review date on the record in the file. This is a gap between two dates, not a ranking and not a measure of how fast any city reached compliance.
The file holds just the latest document for each place. Where that is an amended element adopted after an earlier HCD finding, the review date shown is later than the earlier finding. The file does not say which records these are.
Review dates by year: 3 in 2023, 11 in 2024, 2 in 2025 and 3 in 2026, for the 19 adopted records.
The days from receipt to review run from 3 (Saratoga) to 60 (Atherton, Los Altos Hills, San Jose, Portola Valley). HCD’s process page says reviews after the initial draft take up to 60 days.
Months from January 31, 2023 to the HCD review date in the file
Adopted records in HCD’s file updated November 20, 2026, in alphabetical order. The date may belong to a later amendment; not a ranking. Our calculation: days ÷ 30.4375. Portola Valley left out (draft record).
Show these numbers as a table
| City or town | Months to HCD review date |
|---|---|
| Atherton | 27.1 |
| Belmont | 20.5 |
| Cupertino | 19.1 |
| Foster City | 14.6 |
| Hillsborough | 13.9 |
| Los Altos | 7.1 |
| Los Altos Hills | 36.3 |
| Los Gatos | 17.3 |
| Menlo Park | 13.6 |
| Monte Sereno | 17.1 |
| Mountain View | 3.8 |
| Palo Alto | 18.6 |
| Redwood City | 1.8 |
| San Jose | 11.9 |
| San Mateo | 40.0 |
| Santa Clara | 36.3 |
| Saratoga | 17.2 |
| Sunnyvale | 13.1 |
| Woodside | 24.0 |
Source: California Department of Housing and Community Development (HCD).
| City or town | HCD received | Days after due date | HCD reviewed | Days after due date | Months after due date | Days HCD took |
|---|---|---|---|---|---|---|
| Atherton | March 6, 2025 | 765 | May 5, 2025 | 825 | 27.1 | 60 |
| Belmont | September 11, 2024 | 589 | October 16, 2024 | 624 | 20.5 | 35 |
| Cupertino | July 12, 2024 | 528 | September 4, 2024 | 582 | 19.1 | 54 |
| Foster City | March 21, 2024 | 415 | April 18, 2024 | 443 | 14.6 | 28 |
| Hillsborough | February 1, 2024 | 366 | March 28, 2024 | 422 | 13.9 | 56 |
| Los Altos | August 18, 2023 | 199 | September 5, 2023 | 217 | 7.1 | 18 |
| Los Altos Hills | December 12, 2025 | 1,046 | February 10, 2026 | 1,106 | 36.3 | 60 |
| Los Gatos | June 6, 2024 | 492 | July 10, 2024 | 526 | 17.3 | 34 |
| Menlo Park | January 24, 2024 | 358 | March 20, 2024 | 414 | 13.6 | 56 |
| Monte Sereno | May 13, 2024 | 468 | July 5, 2024 | 521 | 17.1 | 53 |
| Mountain View | April 26, 2023 | 85 | May 26, 2023 | 115 | 3.8 | 30 |
| Palo Alto | July 26, 2024 | 542 | August 20, 2024 | 567 | 18.6 | 25 |
| Portola Valley | July 16, 2026 | 1,262 | September 14, 2026 | 1,322 | 43.4 | 60 |
| Redwood City | February 22, 2023 | 22 | March 27, 2023 | 55 | 1.8 | 33 |
| San Jose | November 30, 2023 | 303 | January 29, 2024 | 363 | 11.9 | 60 |
| San Mateo | April 7, 2026 | 1,162 | June 1, 2026 | 1,217 | 40.0 | 55 |
| Santa Clara | December 19, 2025 | 1,053 | February 10, 2026 | 1,106 | 36.3 | 53 |
| Saratoga | July 5, 2024 | 521 | July 8, 2024 | 524 | 17.2 | 3 |
| Sunnyvale | February 29, 2024 | 394 | March 6, 2024 | 400 | 13.1 | 6 |
| Woodside | January 15, 2025 | 715 | January 29, 2025 | 729 | 24.0 | 14 |
Source: California Department of Housing and Community Development (HCD).
03 · counts by status
How many places
carry each label?
The 20 places: 20 “In”. The two counties: 35 of 37 “In”. The ABAG region: 107 of 109 “In”.
In the two counties, HCD’s file lists 37 jurisdictions: the 20 on this page, 15 other cities and towns, and the two county governments. Two of the other cities, both in San Mateo County, carry one “Out” and one “Enforcement Out”.
Across the nine-county ABAG region the file lists 109 jurisdictions for the 6th cycle: 107 “In” and the same two cities.
Statewide, the file holds 520 records for the 6th cycle: 510 “In”, 9 “Out” and 1 “Enforcement Out”, plus 20 records coded to a 7th cycle elsewhere in the state.
Housing element records by compliance status
Count of records with each HCD compliance label. HCD file updated November 20, 2026.
- 20 places
- Santa Clara and San Mateo counties, 37
- ABAG region, 109
Show these numbers as a table
| 20 places | Santa Clara and San Mateo counties, 37 | ABAG region, 109 | |
|---|---|---|---|
| In | 20 | 35 | 107 |
| Out | 0 | 1 | 1 |
| Enforcement Out | 0 | 1 | 1 |
Source: California Department of Housing and Community Development (HCD).
| Compliance status | 20 places | Two counties (37) | ABAG region (109) |
|---|---|---|---|
| In | 20 | 35 | 107 |
| Out | 0 | 1 | 1 |
| Enforcement Out | 0 | 1 | 1 |
| Conditional | 0 | 0 | 0 |
| All records | 20 | 37 | 109 |
Source: California Department of Housing and Community Development (HCD).
Property Nerd note. “Enforcement Out” is in the file but not in HCD’s data dictionary, which lists In, Conditional and Out for compliance status. We report the label as written.
04 · then and now
Then and now.
Due date against today’s file.
On January 31, 2023, none of the 19 adopted records in today’s file had yet been received by HCD. By November 20, 2026, all 19 had been reviewed.
We found no dated archive of this report, so we cannot show each city’s status on the due date. Instead we counted how many of the 19 adopted records in today’s file carry an HCD review date on or before five dates: 0, 3, 14, 16 and 19.
This is a count of today’s records by their dates, not a count of places in compliance on each date. A city whose current record is a later amendment may have had an earlier finding that the file no longer shows.
Adopted records with an HCD review date on or before each date
Our count of the 19 adopted records in HCD’s file updated November 20, 2026, by their review date. Not a count of places in compliance at each date.
Show these numbers as a table
| Records reviewed | |
|---|---|
| Jan 31, 2023 (due) | 0 |
| Dec 31, 2023 | 3 |
| Dec 31, 2024 | 14 |
| Dec 31, 2025 | 16 |
| Nov 20, 2026 (file) | 19 |
Source: California Department of Housing and Community Development (HCD).
| Measure | Then: January 31, 2023 | Now: November 20, 2026 file |
|---|---|---|
| Current records HCD had received | 0 of 20 | 20 of 20 |
| Adopted records with an HCD review date | 0 of 19 | 19 of 19 |
| Review status “In” on the current record | — | 20 of 20 |
| Compliance status “In” | Not published for that date | 20 of 20 |
| Approved Prohousing Designation (tracker dates) | 0 of 20 | 4 of 20 |
Source: California Department of Housing and Community Development (HCD).
Property Nerd note. The Prohousing count “then” uses the award dates in HCD’s tracker. The earliest among the 20 is Redwood City, April 4, 2023, after the due date.
05 · prohousing
Which cities hold
a Prohousing Designation?
Four of the 20 are listed as approved. San Jose shows “Pending Final Review” and Palo Alto “Initial Review”. Fourteen are not in the tracker.
HCD’s program page says the designation is for places that go above and beyond state housing law to help speed housing production, and that a designated place may get priority processing or funding points in several state funding programs.
HCD’s tracker, headed “As of August 2026” in a file named for April 30, 2026, lists Redwood City (awarded April 4, 2023), Mountain View (December 29, 2023), Los Altos (January 23, 2025) and Sunnyvale (May 27, 2025) as approved. Elsewhere in the two counties it lists Campbell and South San Francisco as approved.
Points are shown as HCD recorded them. We do not compare them.
| City or town | County | HCD status | Application received | Designation awarded | Points awarded |
|---|---|---|---|---|---|
| Los Altos | Santa Clara | Approved Prohousing Designation | February 29, 2024 | January 23, 2025 | 33 |
| Mountain View | Santa Clara | Approved Prohousing Designation | March 15, 2023 | December 29, 2023 | 37 |
| Redwood City | San Mateo | Approved Prohousing Designation | March 2, 2023 | April 4, 2023 | 39 |
| Sunnyvale | Santa Clara | Approved Prohousing Designation | December 9, 2024 | May 27, 2025 | 62 |
| San Jose | Santa Clara | Pending Final Review | August 27, 2025 | — | — |
| Palo Alto | Santa Clara | Initial Review | August 3, 2026 | — | — |
| The other 14 places | Both | Not listed in the tracker | — | — | — |
Source: California Department of Housing and Community Development (HCD).
06 · what the labels mean
What is a housing element.
And what does “In” mean?
Definitions as HCD gives them, in plain words. No legal reading of our own.
A housing element is the part of a city’s general plan that shows how it will plan for housing need. HCD reviews every local government’s element against state housing element law and sends written findings back.
HCD’s compliance page says a jurisdiction is in compliance as of the date of HCD’s letter finding the adopted element in substantial compliance. A city cannot make that finding for itself.
On late elements, HCD’s process page says that where an element found in substantial compliance is not adopted within 120 days of the statutory deadline, the necessary rezoning is due within one year of that deadline. HCD’s background page says some funding programs require a compliant element and others give extra points for one. We apply neither to any city.
For what has been permitted since, see new housing permits, the housing pipeline by city and ADU permits by city.
| Term | What HCD says |
|---|---|
| Review status: In | Adopted element is in compliance with state housing element law. |
| Review status: Out | Adopted element is not in compliance, or not yet submitted on the statutory schedule. |
| Review status: Due | Element not submitted for the current planning period. |
| Review status: In Review | Element is currently being reviewed. |
| Compliance status: Conditional | Adopted element is in compliance, predicated on certain conditions. |
| Date received / Date reviewed | Date HCD received the element for review / date HCD completed its review. |
| In compliance (date) | As of the date of HCD’s letter finding the adopted element in substantial compliance. |
| Late element (process page) | Necessary rezones due within one year of the statutory deadline if an element found in substantial compliance is not adopted within 120 days of it. |
| Funding (background page) | Some state and federal programs require a compliant element; others award extra points. |
Source: California Department of Housing and Community Development (HCD).
Method
How we measured.
- Status. HCD Housing Element Compliance Report CSV (state open data site), updated and downloaded November 20, 2026. Rows matched by name and county; labels and dates copied as written.
- Due date. January 31, 2023, from HCD’s January 12, 2022 letter approving ABAG’s allocation plan (on HCD letterhead; the copy we read is posted on ABAG’s website). It asks ABAG to inform local governments of their share to address their 6th-cycle housing element by that date.
- Days and months. Days = HCD date minus January 31, 2023; months = days ÷ 30.4375. Example: San Jose, reviewed January 29, 2024: 363 days = 11.9 months. Median of the 19 adopted records: the 10th value, 17.2 months (Saratoga). The date is for the record in today’s file, possibly a later amendment, so these gaps do not measure how fast a city reached compliance.
- Counts. Compliance Status column: the 20 places; the 37 rows in Santa Clara or San Mateo County; the 109 ABAG rows; the 520 rows coded 6th cycle.
- Prohousing. HCD Prohousing Designation Application Tracker (linked from HCD’s Application Status and Public Comment page), header “As of August 2026”. Spreadsheet date numbers converted to dates. Staff names not reproduced.
- Limits. Earlier findings and adoption dates are not in the file. HCD’s review letters sit in an interactive tool we did not use. No judgement of any city, no legal reading, no forecast. General information.
Questions
Common questions.
Plain answers.
Is San Jose’s housing element in compliance?
HCD’s file updated November 20, 2026 lists San Jose with review status “In” and compliance status “In”. HCD received the adopted element November 30, 2023 and completed its review January 29, 2024.
When were Bay Area housing elements due?
January 31, 2023. HCD’s January 12, 2022 letter to ABAG gives that date for local governments to address their 6th-cycle housing element, which covers 2023 to 2031.
Does HCD list any of the 20 places as “Out”?
No. As of November 2026 HCD lists all 20 as “In”. In the two counties, two other cities carry “Out” and “Enforcement Out”.
What does “In” mean in HCD’s report?
HCD’s data dictionary defines “In” as an adopted element in compliance with state housing element law. HCD’s compliance page says a place is in compliance as of the date of HCD’s letter finding the adopted element in substantial compliance.
Which cities have a Prohousing Designation?
Of the 20 places, Redwood City, Mountain View, Los Altos and Sunnyvale, per HCD’s tracker as of August 2026. San Jose shows “Pending Final Review” and Palo Alto “Initial Review”.
Why does Portola Valley show a draft?
HCD’s file holds the latest document per place. For Portola Valley that is a “Subsequent Draft” received July 16, 2026 and reviewed September 14, 2026; the same row shows compliance status “In”.
More data
Keep counting.
Every page in Silicon Valley by the Numbers is built from official public data, with the method shown.
558.75
Silicon Valley Home Price Index
San Jose-Sunnyvale-Santa Clara metro area index (1995 Q1 = 100). 2026 Q2, release of August 2026.
See the data →7.11%
Mortgage Rate History
30-year fixed, U.S. average. Week dated November 12, 2026.
See the data →737,988
Silicon Valley Housing Stock by City
Housing units, 20 cities combined (our sum). January 1, 2026 (provisional).
See the data →1975
When Silicon Valley Homes Were Built
Median year built, Santa Clara County (±1 year). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →47,422
Silicon Valley New Housing Permits
Housing units issued building permits, 20 cities, 2018 to 2025 (our sum). File updated November 13, 2026.
See the data →9,280
Silicon Valley ADU Permits by City
ADUs issued building permits, 20 cities and towns, 2018 to 2025 (our sum). File updated November 13, 2026.
See the data →74.8–88.8°F
Silicon Valley Climate by City
Normal daily high in each station’s warmest month, eight stations. 1991–2020 normals.
See the data →$1,249,125
Silicon Valley Conforming Loan Limits
One-unit limit, Santa Clara and San Mateo counties. 2026 limits, announced November 25, 2025.
See the data →1,119,582
Silicon Valley Jobs by Industry
Jobs at workplaces in Santa Clara County, 2025 annual average. BLS file dated August 21, 2026.
See the data →29.4%
Silicon Valley Homes by Bedroom Count
Santa Clara County housing units with three bedrooms (±0.4 points). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →31,552
Silicon Valley Housing Growth by City
Net housing units added in the 20 cities since the 2020 benchmark (our sum). January 1, 2026 (provisional), compared with April 1, 2020. Released May 1, 2026.
See the data →58.5%
Silicon Valley Home Heating by City
Occupied homes heated mainly by utility gas, Santa Clara County (±0.5 points). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →23.9%
Working From Home in Silicon Valley, by City
Workers living in Santa Clara County who worked from home (±0.4 points); 5.0% in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →280,157
Silicon Valley Electric Vehicles and Home Charging
Zero-emission vehicles registered in Santa Clara and San Mateo counties (our sum). Data as of December 31, 2025.
See the data →18 of 20
Silicon Valley Electricity Providers by City
Cities and towns where PG&E delivers the electricity. California Energy Commission utility layer, read November 18, 2026.
See the data →24,043
Silicon Valley New Business Applications
Business applications in Santa Clara County, 2025. Census file released June 10, 2026.
See the data →24.4%
Silicon Valley Tech Workers by City
Employed Santa Clara County residents in computer, engineering and science occupations (our calculation from Census counts; ±0.3 points). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →26.2 min
Silicon Valley Commute Times by City
Mean one-way trip to work, workers living in Santa Clara County (±0.3 minutes; mean and margin are our calculation from Census tables); 29.3 in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →$1,490,600
Silicon Valley Home Values and Rents by City: The Census Figures
Median value (dollars), owner-occupied housing units, Santa Clara County (±$14,163). An owner-reported survey estimate, not a sale price. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →55.1%
Silicon Valley Owners and Renters by City
Owner-occupied share of occupied housing units, Santa Clara County (±0.5 points, our calculation from Census counts); 56.4% in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →3,558
Silicon Valley Tech Businesses by ZIP Code
Computer systems design establishments in Santa Clara and San Mateo counties, 2023 (our sum of two county counts). 2023 County Business Patterns, released June 26, 2025.
See the data →2.3%
How Silicon Valley Gets to Work, by City
Workers living in Santa Clara County who rode public transportation to work (±0.1 points, our calculation); 4.4% in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →95.6%
Silicon Valley Home Internet by City
Occupied homes with a broadband subscription of any type, Santa Clara County (±0.2 points, as published); 91.8% in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →2008
How Long Silicon Valley Residents Stay in Their Homes, by City
Median year the occupant moved in, owner-occupied homes, Santa Clara County (±1 year, as published); 2005 (±1) in San Mateo County. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →8.1%
Silicon Valley Self-Employed Workers by City
Employed civilians living in Santa Clara County who are self-employed (±0.2 points, our calculation); 8.3% in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →6.0%
Silicon Valley Vehicles per Home by City
Occupied homes in Santa Clara County with no vehicle (±0.2 points, our calculation); 5.8% in San Mateo County (±0.4). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →33.0%
Silicon Valley Homes Owned Free and Clear by City
Owner-occupied homes in Santa Clara County without a mortgage (±0.6 points, our calculation); 33.9% in San Mateo County (±0.7). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →5.6%
Silicon Valley Vacant Homes by City
Housing units in Santa Clara County vacant when surveyed (±0.3 points, our calculation); 7.9% in San Mateo County (±0.4). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →388.8 sq mi
Silicon Valley Land Area and Housing Density by City
Land area, 20 cities combined (our sum). 2026 Gazetteer Files.
See the data →5.0
Silicon Valley Rooms per Home by City
Median rooms per housing unit, Santa Clara County (±0.2). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →4,486
Caltrain Ridership by Station in Silicon Valley
Average mid-week ridership starting at Palo Alto station (estimate from fare sales). Fiscal year 2026 (July 2025 to June 2026); report dated September 2026.
See the data →10.000%
Silicon Valley Sales Tax Rates by City
San Jose, the highest combined rate of the 20 cities and towns. CDTFA rate file effective October 1, 2026; read November 2026.
See the data →133,667
Silicon Valley Housing Targets by City
Homes assigned to the 20 cities and towns for 2023 to 2031 (our sum of 20 plan totals). ABAG Final RHNA Plan, adopted December 2021, updated June 2026; read November 2026.
See the data →$760.08B
Silicon Valley Assessed Value by City
Santa Clara County 2026–2027 net assessment roll, all cities plus unincorporated areas (growth 4.74% in the report text). Assessor’s Annual Report 2026, printed page 9 (report file dated October 15, 2026); read November 2026.
See the data →61,610 acres
Silicon Valley Fire Hazard Severity Zones by City
In Moderate, High or Very High zones, 20 cities combined (our sum). 2025 maps; table read November 19, 2026.
See the data →$1.10
Silicon Valley Property Transfer Tax by City
County transfer tax per $1,000 of value in both counties (55 cents per $500). Read November 2026.
See the data →1,352
VTA Light Rail Ridership by Station
Average weekday boardings at San Antonio station in San Jose in October 2025, the highest of the 53 stations that are not line ends. One month of VTA planning data, not an official or yearly figure. Average day in October 2025, one month and not a yearly count; VTA planning dataset, not official VTA Operations figures; posted March 2026; read November 2026.
See the data →10,675,167
Silicon Valley Airport Passenger Counts
Total passengers at San Jose Mineta International Airport in 2025 (enplaned plus deplaned), 9.9% fewer than in 2024. Calendar year 2025; report printed January 23, 2026.
See the data →36,751 acres
Silicon Valley FEMA Flood Zones by City
Land in a Special Flood Hazard Area, 20 places combined (our measurement). FEMA flood layer read November 19, 2026.
See the data →110,080 acres
Silicon Valley Earthquake Hazard Zones by City
Land in liquefaction zones, 20 places combined: 44.2% of land (our measurement). CGS map layers read November 19, 2026.
See the data →123
Silicon Valley National Register Listings by City
National Register listings recorded under the 20 cities and towns (our count of NPS rows). NPS spreadsheet dated May 22, 2026; read November 2026.
See the data →10,713
Silicon Valley Mortgage Lending by County
Home-purchase loans made in Santa Clara County in 2025; 4,231 in San Mateo County. 2025 HMDA Snapshot data, frozen June 2, 2026; not final.
See the data →240
Silicon Valley Air Quality by Year
Good days (AQI 0–50), Santa Clara County, highest count of 2000–2023. 2023, EPA file as of June 25, 2026.
See the data →$3,483
Silicon Valley Fair Market Rents by ZIP Code
2-bedroom Fair Market Rent, San Jose-Sunnyvale-Santa Clara HUD Metro FMR Area (Santa Clara County), per month, gross rent. FY2026 (October 1, 2025 to September 30, 2026).
See the data →16
Silicon Valley Water Suppliers and Use by City
Main retail water suppliers serving the 20 cities and towns, counting Cal Water’s three districts separately (small community systems not counted). State boundary layer and agency pages, read November 19, 2026.
See the data →1,914,391
Silicon Valley Population by City
People in the 20 cities and towns on January 1, 2026 (our sum of 20 DOF estimates). DOF E-1, released May 1, 2026; January 1, 2026 provisional.
See the data →87,159
Silicon Valley Rooftop Solar by City
Home solar sites in the 18 PG&E-served cities and towns, 537.8 MW (AC) in all. PG&E data via California Distributed Generation Statistics, current as of September 30, 2026.
See the data →6,755
Silicon Valley Home Insurance Market by ZIP Code
FAIR Plan residential policies in force in the 63 ZIPs, up from 1,493 in 2022 (+352.4%). September 30, 2026; FAIR Plan ZIP table released October 2026, read November 2026.
See the data →1.0860% to 1.31610%
Silicon Valley Property Tax Rates by City
Range of 2025-26 property tax rates across the tax rate areas of the 20 cities and towns. County rate books for fiscal year 2025-26; read as of November 2026.
See the data →2,462
BART Ridership at Silicon Valley Stations
Average weekday exits at Berryessa/North San Jose station in October 2026, +26.6% on October 2025. Milpitas had 1,841. Average weekday in October 2026; BART monthly entry-exit file posted November 2026; read as of November 2026.
See the data →21.9%
Silicon Valley Tree Canopy by City
Tree canopy cover across the measured land of the 20 cities and towns in 2022 (our sum: 44,142 of 201,895 acres). USDA Forest Service and CAL FIRE canopy statistics by city, 2018 and 2022 imagery; layer updated July 2026, read November 2026.
See the data →371.820
Bay Area Consumer Prices and Shelter Costs
All-items index, San Francisco-Oakland-Hayward (1982–84 = 100); U.S. city average 337.511. October 2026; read from BLS on November 20, 2026.
See the data →4.2%
Silicon Valley Unemployment Rate by City
Santa Clara County unemployment rate, 2025 annual average (not seasonally adjusted). EDD LAUS annual averages, file of October 2026.
See the data →0.2%
Silicon Valley Mortgage Delinquency by County
Santa Clara County mortgages 90 or more days delinquent; 0.4% were 30 to 89 days late. March 2026 data, published November 2026.
See the data →23
Silicon Valley Superfund Sites by City
Superfund (NPL) sites in Santa Clara County; San Mateo County has none. EPA NPL data last edited September 30, 2026; read November 20, 2026.
See the data →33,388
Silicon Valley Parks and Open Space by City
Acres of protected land inside the 20 city limits, 13.4% of their land area (our overlay and division). CPAD 2026a (June 2026); city limits as of January 1, 2026.
See the data →31.35¢
Silicon Valley Electricity and Natural Gas Prices
Average residential electricity price per kWh, California, 2025; U.S. total 17.23¢. Annual 2025, final data released October 7, 2026.
See the data →+1.70°F
Silicon Valley Temperature and Rainfall Trends
Change in average annual mean temperature at San Francisco International Airport, 1961–1990 (57.0°F) to 1996–2025 (58.7°F), our arithmetic. NOAA NCEI Global Summary of the Month, read as of November 2026.
See the data →12.88 ft
Silicon Valley Groundwater and Land Subsidence
Sinking at USGS bench mark P7 in San Jose, 1912 leveling to 1969; 12.67 ft by 1967. USGS Professional Paper 497-F, published 1988.
See the data →1.98 mm/yr
Bay Area Sea Level Trend: The Tide Gauge Record
NOAA relative sea level trend at San Francisco, September 1897 to December 2025: 0.78 ± 0.03 inches per decade as published (mm conversion ours). NOAA CO-OPS sea level trends, read as of November 2026.
See the data →292,690
Silicon Valley Wildfire History
Acres inside Santa Clara County within 86 recorded wildfire perimeters, 1950–2025 (our overlay; summed fire by fire). firep25_1 (released April 2026), read November 20, 2026.
See the data →667
Silicon Valley Earthquake History
Earthquakes of M3.0 or more with epicenters in Santa Clara and San Mateo counties, 1900 to November 19, 2026 (our count: 630 and 37). USGS ComCat, queried November 20, 2026.
See the data →273,000
Silicon Valley Freeway Traffic Counts
Vehicles a day on US-101 at Tully Road, San Jose: the highest 2024 count in the two counties. Caltrans 2024 traffic volumes file (latest year posted as of November 2026).
See the data →17.0%
Silicon Valley Reservoir Storage
Share of capacity held by the eight Santa Clara County reservoirs: 27,882 of 164,122 acre-feet (our sum). Daily storage, November 18, 2026; read November 20, 2026.
See the data →83
Silicon Valley Street Pavement Condition by City
PCI for Palo Alto’s streets, the highest of the 20 places (MTC band: Very Good). Three-year average for 2022 to 2024, released November 2025.
See the data →$5.289
Bay Area Gasoline Prices
Regular gasoline, San Francisco area, average price per gallon including taxes. Week of November 16, 2026 (EIA release of November 17, 2026).
See the data →$8.50
Bay Area Bridge Tolls and Crossings
Regular toll for a two-axle vehicle at all seven state-owned bridges, whether paid by FasTrak, license plate account or invoice. Effective January 1, 2026; as of November 2026.
See the data →30 of 63
Silicon Valley Home Price Index by ZIP Code
ZIP codes matched to the 20 places that have a 2025 index value in FHFA’s file; 14 of the 20 places have none. FHFA annual ZIP5 index, data through 2025, file updated March 31, 2026; read November 2026.
See the data →$2,487
Silicon Valley Rents by Bedroom Count
Median gross rent, 1 bedroom, Santa Clara County (±$31). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →20 of 20
Silicon Valley Monthly Owner Costs by City
Places on this page whose median monthly owner cost with a mortgage is published as $4,000+, a ceiling, not a measurement. Both counties too. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →8,513
Silicon Valley Housing Pipeline by City
Units completed in 2025 in the 20 places, up from 4,328 in 2021 (our sums). HCD annual progress report data, updated November 20, 2026; reporting years 2021 and 2025.
See the data →$1,249,125
Silicon Valley FHA Loan Limits
FHA one-unit limit, Santa Clara and San Mateo counties. 2026 limits, Mortgagee Letter 2025-23, December 11, 2025.
See the data →3.5%
San Jose Metro Rental and Homeowner Vacancy Rates
San Jose metro rental vacancy rate, 2025 (±1.6 points, 90 percent margin). CPS/HVS Annual Statistics 2025; read November 2026.
See the data →$1.22 billion
Silicon Valley New Home Construction Value by City
Permit valuation for new homes, 20 cities and towns, 2025 (our sum; $1,219,435,918 exactly). Census Building Permits Survey, 2025 annual place file dated May 14, 2026; read as of November 2026.
See the data →Your next move · The Property Nerds®
Read the numbers.
Then choose your part of the Valley.
Buying in Silicon Valley
Tell us where you work, how you like to get around and what kind of house you are after. We will help you compare cities and streets with that in mind.
See the buyer advantage ↗ Find your fit ↗Selling in Silicon Valley
Buyers ask about the area as much as the house. We help you present both clearly, from preparation to pricing to launch.
See the seller advantage ↗ What is my home worth? ↗Ask a Property Nerd®
Have a question about a number on this page? Send it to the Property Nerds. We will show you where it comes from and what it does and does not measure.
Ask a Property Nerd ↗ How we measure ↗Eric and Janelle Boyenga · The Property Nerds® at Compass. Recognized as NextGenAgents by a national real estate portal.
Talk with the Boyenga Team at Compass: (408) 373-1660 or (650) 383-8606, or send us a note.