Silicon Valley by the Numbers · ADU Permits by City
ADUs by the numbers.
Twenty cities, eight years.
An accessory dwelling unit (ADU) is a second, self-contained home on the same lot as a main home. California cities and counties file a housing report with the state each year, and it lists ADU building permits. We counted them for 20 cities and towns in Santa Clara and San Mateo counties. A permit is permission to start building. It is not a finished unit.
See the numbers ↓The short answer
The 20 Silicon Valley cities and towns on this page reported building permits for 9,280 accessory dwelling units (ADUs) in reporting years 2018 through 2025, which is 19.6% of the 47,422 housing units they permitted. The yearly count went from 449 in 2018 to 1,741 in 2025. These are our sums of California Department of Housing and Community Development (HCD) Annual Progress Report data, Table A2, as of November 2026 (file updated November 13, 2026).
01 · ADUs by year
What is an ADU, and how many
get permitted each year?
The 20 places together reported 449 ADU permits in 2018 and 1,741 in 2025.
HCD’s ADU Handbook (March 2026) describes an accessory dwelling unit as a separate home, attached to the main home or detached from it, on a lot that has or will have a primary residence. It is a complete place to live on its own, with permanent space to sleep, cook and eat and its own sanitation. The handbook gives Government Code section 66313 as the source of the definition.
A junior ADU (JADU), in the same handbook, is a unit of no more than 500 square feet of interior livable space, contained entirely within a house. It may have its own bathroom or share one with the house. These are definitions of terms, not a statement of what any lot may have. The state report form has one ADU code and no separate junior code, so the counts on this page cannot be split between the two.
The combined count was higher than the year before in every year except 2020 (849, after 853 in 2019). The 2025 count is 313 above 2024 (21.9%). One gap: the file has no 2019 rows for Hillsborough, so the 2019 figure covers 19 places.
ADUs issued building permits, by year
Units, 20 Silicon Valley cities and towns combined (our sum), reporting years 2018 to 2025 (2019: no Hillsborough rows)
Show these numbers as a table
| ADUs issued building permits | |
|---|---|
| 2018 | 449 |
| 2019 | 853 |
| 2020 | 849 |
| 2021 | 1,248 |
| 2022 | 1,294 |
| 2023 | 1,418 |
| 2024 | 1,428 |
| 2025 | 1,741 |
Source: California Department of Housing and Community Development (HCD).
| Reporting year | ADUs issued building permits | All housing units issued building permits | ADU share |
|---|---|---|---|
| 2018 | 449 | 5,640 | 8.0% |
| 2019 | 853 | 5,459 | 15.6% |
| 2020 | 849 | 5,320 | 16.0% |
| 2021 | 1,248 | 5,269 | 23.7% |
| 2022 | 1,294 | 9,285 | 13.9% |
| 2023 | 1,418 | 6,463 | 21.9% |
| 2024 | 1,428 | 4,216 | 33.9% |
| 2025 | 1,741 | 5,770 | 30.2% |
| 2018 to 2025 | 9,280 | 47,422 | 19.6% |
Source: California Department of Housing and Community Development (HCD).
Property Nerd note. These yearly totals are our sums of the state’s project-level rows, not figures HCD publishes. Each unit is counted once, in the year of its permit date.
02 · ADUs by city
How many ADUs did
each city permit?
San Jose reported 3,337 ADUs over the eight years, 36.0% of the 20-place total. Foster City reported 50.
Palo Alto follows with 741, then Sunnyvale (515), San Mateo (498) and Santa Clara (495). These are raw counts, not adjusted for the size of each place.
In reporting year 2025, San Jose reported 502 ADUs, Santa Clara reported 140 and Palo Alto reported 136. Foster City’s 2018 report is in the file with no ADU dated that year, so it shows as 0. Hillsborough’s 2019 cell is not available, which is different from zero.
ADUs issued building permits, by city
Units, reporting years 2018 to 2025 combined (Hillsborough: seven years)
Show these numbers as a table
| ADUs, 2018 to 2025 | |
|---|---|
| San Jose | 3,337 |
| Palo Alto | 741 |
| Sunnyvale | 515 |
| San Mateo | 498 |
| Santa Clara | 495 |
| Redwood City | 476 |
| Saratoga | 467 |
| Los Altos | 451 |
| Mountain View | 325 |
| Menlo Park | 312 |
| Hillsborough | 268 |
| Los Gatos | 264 |
| Cupertino | 240 |
| Los Altos Hills | 198 |
| Atherton | 195 |
| Belmont | 149 |
| Woodside | 140 |
| Monte Sereno | 97 |
| Portola Valley | 62 |
| Foster City | 50 |
Source: California Department of Housing and Community Development (HCD).
| City or town | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2018 to 2025 |
|---|---|---|---|---|---|---|---|---|---|
| San Jose | 192 | 416 | 331 | 420 | 448 | 470 | 558 | 502 | 3,337 |
| Palo Alto | 36 | 62 | 43 | 89 | 120 | 127 | 128 | 136 | 741 |
| Sunnyvale | 30 | 49 | 59 | 79 | 59 | 59 | 73 | 107 | 515 |
| San Mateo | 8 | 45 | 52 | 68 | 82 | 83 | 66 | 94 | 498 |
| Santa Clara | 21 | 51 | 45 | 53 | 76 | 54 | 55 | 140 | 495 |
| Redwood City | 23 | 39 | 60 | 81 | 83 | 78 | 49 | 63 | 476 |
| Saratoga | 16 | 24 | 43 | 66 | 46 | 79 | 74 | 119 | 467 |
| Los Altos | 8 | 36 | 23 | 62 | 62 | 109 | 62 | 89 | 451 |
| Mountain View | 6 | 15 | 18 | 31 | 42 | 70 | 57 | 86 | 325 |
| Menlo Park | 15 | 4 | 13 | 36 | 56 | 68 | 57 | 63 | 312 |
| Hillsborough | 13 | n/a | 22 | 54 | 30 | 50 | 43 | 56 | 268 |
| Los Gatos | 16 | 28 | 28 | 36 | 35 | 41 | 27 | 53 | 264 |
| Cupertino | 15 | 15 | 19 | 41 | 30 | 17 | 44 | 59 | 240 |
| Los Altos Hills | 5 | 8 | 25 | 41 | 31 | 23 | 35 | 30 | 198 |
| Atherton | 6 | 10 | 34 | 32 | 25 | 18 | 25 | 45 | 195 |
| Belmont | 9 | 12 | 11 | 12 | 30 | 21 | 25 | 29 | 149 |
| Woodside | 15 | 16 | 9 | 19 | 15 | 22 | 23 | 21 | 140 |
| Monte Sereno | 8 | 14 | 9 | 14 | 18 | 13 | 9 | 12 | 97 |
| Portola Valley | 7 | 7 | 3 | 11 | 2 | 10 | 11 | 11 | 62 |
| Foster City | 0 | 2 | 2 | 3 | 4 | 6 | 7 | 26 | 50 |
| 20 places combined | 449 | 853 | 849 | 1,248 | 1,294 | 1,418 | 1,428 | 1,741 | 9,280 |
Source: California Department of Housing and Community Development (HCD).
Property Nerd note. Hillsborough’s total of 268 covers seven reporting years, not eight.
04 · permit or finished
Is a permitted ADU
a finished ADU?
No. A building permit is permission to start construction. A certificate of occupancy comes at the end.
HCD’s instructions count a unit as permitted when the local government issued its building permit for new housing construction during the reporting calendar year. The same form has a later column for the date a certificate of occupancy, or another form of readiness such as a final inspection, was issued.
We do not publish a count of finished ADUs from that column. It holds what each city entered, and it is incomplete: in 22 of the 159 city-and-year reports behind this page, the file shows ADU permits and no ADU certificate at all. The file cannot tell a true zero from a blank.
The two columns also describe different moments. An ADU permitted in one year may be finished in a later one, and the instructions tell cities to leave the certificate date blank when no certificate was issued in the reporting year.
Property Nerd note. This page counts permits. It gives no count of finished ADUs and no completion rate.
05 · home search
What this means
for a home search.
ADU counts show what each city has permitted, year by year.
Treat a count as a record of past permits. It does not show what is finished, what is on the market, or what any one lot may have. For one property, look at the city’s own permit record. Our guide to home permit research walks through it.
Rules for ADUs are set by state law and by each city’s own ordinance, and they change. Questions about one lot go to that city’s planning department. This is general information, not financial, tax or legal advice.
For the wider picture, see new housing permits for every building type and housing growth by city for the state’s estimates of homes added.
More data pages are on Silicon Valley by the Numbers, each built from official public data with the method shown.
Method
How we measured.
- Source. California Department of Housing and Community Development (HCD), Housing Element Annual Progress Report (APR) data, Table A2, on the state open data site: updated November 13, 2026, downloaded November 18, 2026, reporting years 2018 to 2025. Reports are due April 1 for the prior year, so 2025 is the latest full year. Figures are as of November 2026.
- Geography. The 20 cities and towns as HCD names them. County rows cover unincorporated areas and are left out. The file has no 2019 rows for Hillsborough, shown as not available, not as zero.
- Formula. ADUs for a city and year = the sum of “units issued building permits” over rows coded ADU whose permit date falls in that reporting year. ADU share = ADUs ÷ all units counted the same way × 100, rounded to one decimal for display. Combined figures are our sums of the 20 places.
- Why the date rule. A report can hold rows whose permit date falls outside its reporting year. Adding every ADU row gives 10,264 units. The date rule gives 9,280: 944 units sit in rows dated before the reporting year and 40 in rows dated after it.
- Certificates. The file also has a column for units issued certificates of occupancy or other forms of readiness. It is what each city reported and it is incomplete (22 of 159 city-and-year reports show ADU permits and no ADU certificate), so we publish no certificate counts and no completion rate.
- Cross-check. The city totals and yearly ADU counts here equal the ADU figures on our new housing permits page, which uses the same file and rule.
- Limits. The data is self-reported by each city, and HCD states that it does not independently verify it. The form has no separate junior ADU code. The counts do not show the size, type or location of any unit, and say nothing about what a given lot may have.
Questions
Common questions.
Plain answers.
How many ADUs were permitted in Silicon Valley in 2025?
The 20 cities and towns on this page reported building permits for 1,741 ADUs in reporting year 2025, compared with 1,428 in 2024 and 449 in 2018. That is our sum of HCD Annual Progress Report data, Table A2 (file updated November 13, 2026).
What is the difference between an ADU and a junior ADU?
HCD’s ADU Handbook (March 2026) describes an ADU as a separate, complete home, attached or detached, on a lot that has or will have a primary residence. A junior ADU is no more than 500 square feet of interior livable space and sits entirely within a house, and it may share a bathroom with that house. The state permit file has one ADU code and no separate junior code.
How many ADUs has San Jose permitted?
San Jose reported building permits for 3,337 ADUs in reporting years 2018 through 2025, including 502 in 2025. ADUs were 18.5% of the 18,059 housing units the city permitted in that period (file updated November 13, 2026).
Where are ADUs more than half of new housing permits?
In eight of the 20 places: Hillsborough, Portola Valley, Woodside, Los Altos Hills, Palo Alto, Saratoga, Monte Sereno and Atherton. In Hillsborough, 268 of 279 permitted units from 2018 to 2025 were ADUs, a share of 96.1% (file updated November 13, 2026; Hillsborough has no 2019 rows).
Does an ADU permit mean the ADU was built?
No. A permit is permission to start construction. The state file has a separate column for certificates of occupancy, but it holds what each city entered and it is incomplete: in 22 of the 159 city-and-year reports behind this page it shows ADU permits and no ADU certificate. This page gives permit counts, with no count of finished ADUs and no completion rate (file updated November 13, 2026).
Can this page tell me whether a lot can have an ADU?
No. The counts show past permits by city and year, nothing about any one lot. State law and each city’s own ordinance set the rules, and the city’s planning department is the place to ask.
More data
Keep counting.
Every page in Silicon Valley by the Numbers is built from official public data, with the method shown.
558.75
Silicon Valley Home Price Index
San Jose-Sunnyvale-Santa Clara metro area index (1995 Q1 = 100). 2026 Q2, release of August 2026.
See the data →7.11%
Mortgage Rate History
30-year fixed, U.S. average. Week dated November 12, 2026.
See the data →737,988
Silicon Valley Housing Stock by City
Housing units, 20 cities combined (our sum). January 1, 2026 (provisional).
See the data →1975
When Silicon Valley Homes Were Built
Median year built, Santa Clara County (±1 year). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →47,422
Silicon Valley New Housing Permits
Housing units issued building permits, 20 cities, 2018 to 2025 (our sum). File updated November 13, 2026.
See the data →74.8–88.8°F
Silicon Valley Climate by City
Normal daily high in each station’s warmest month, eight stations. 1991–2020 normals.
See the data →$1,249,125
Silicon Valley Conforming Loan Limits
One-unit limit, Santa Clara and San Mateo counties. 2026 limits, announced November 25, 2025.
See the data →1,119,582
Silicon Valley Jobs by Industry
Jobs at workplaces in Santa Clara County, 2025 annual average. BLS file dated August 21, 2026.
See the data →29.4%
Silicon Valley Homes by Bedroom Count
Santa Clara County housing units with three bedrooms (±0.4 points). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →31,552
Silicon Valley Housing Growth by City
Net housing units added in the 20 cities since the 2020 benchmark (our sum). January 1, 2026 (provisional), compared with April 1, 2020. Released May 1, 2026.
See the data →58.5%
Silicon Valley Home Heating by City
Occupied homes heated mainly by utility gas, Santa Clara County (±0.5 points). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →23.9%
Working From Home in Silicon Valley, by City
Workers living in Santa Clara County who worked from home (±0.4 points); 5.0% in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →280,157
Silicon Valley Electric Vehicles and Home Charging
Zero-emission vehicles registered in Santa Clara and San Mateo counties (our sum). Data as of December 31, 2025.
See the data →18 of 20
Silicon Valley Electricity Providers by City
Cities and towns where PG&E delivers the electricity. California Energy Commission utility layer, read November 18, 2026.
See the data →24,043
Silicon Valley New Business Applications
Business applications in Santa Clara County, 2025. Census file released June 10, 2026.
See the data →24.4%
Silicon Valley Tech Workers by City
Employed Santa Clara County residents in computer, engineering and science occupations (±0.3 points). ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →26.2 min
Silicon Valley Commute Times by City
Mean one-way trip to work, workers living in Santa Clara County (±0.3 minutes); 29.3 in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.
See the data →Your next move
Read the numbers.
Then choose your part of the Valley.
Buying in Silicon Valley
Tell us where you work, how you like to get around and what kind of house you are after. We will help you compare cities and streets with that in mind.
See the buyer advantage ↗ Find your fit ↗Selling in Silicon Valley
Buyers ask about the area as much as the house. We help you present both clearly, from preparation to pricing to launch.
See the seller advantage ↗ What is my home worth? ↗Talk with the Boyenga Team at Compass: (408) 373-1660 or (650) 383-8606, or send us a note.