Silicon Valley by the Numbers · ADU Permits by City

ADUs by the numbers.
Twenty cities, eight years.

An accessory dwelling unit (ADU) is a second, self-contained home on the same lot as a main home. California cities and counties file a housing report with the state each year, and it lists ADU building permits. We counted them for 20 cities and towns in Santa Clara and San Mateo counties. A permit is permission to start building. It is not a finished unit.

See the numbers ↓

The short answer

The 20 Silicon Valley cities and towns on this page reported building permits for 9,280 accessory dwelling units (ADUs) in reporting years 2018 through 2025, which is 19.6% of the 47,422 housing units they permitted. The yearly count went from 449 in 2018 to 1,741 in 2025. These are our sums of California Department of Housing and Community Development (HCD) Annual Progress Report data, Table A2, as of November 2026 (file updated November 13, 2026).

9,280ADUs issued building permits, 20 cities and towns, 2018 to 2025 (our sum)File updated November 13, 2026 · California Department of Housing and Community Development (HCD)
1,741ADUs issued building permits in reporting year 2025, compared with 449 in 2018File updated November 13, 2026 · California Department of Housing and Community Development (HCD)
19.6%ADU share of all 47,422 housing units permitted, 2018 to 2025 (our calculation)File updated November 13, 2026 · California Department of Housing and Community Development (HCD)
8 of 20Cities and towns where ADUs were more than half of all permitted units, 2018 to 2025 (our calculation)File updated November 13, 2026 · California Department of Housing and Community Development (HCD)

01 · ADUs by year

What is an ADU, and how many
get permitted each year?

The 20 places together reported 449 ADU permits in 2018 and 1,741 in 2025.

HCD’s ADU Handbook (March 2026) describes an accessory dwelling unit as a separate home, attached to the main home or detached from it, on a lot that has or will have a primary residence. It is a complete place to live on its own, with permanent space to sleep, cook and eat and its own sanitation. The handbook gives Government Code section 66313 as the source of the definition.

A junior ADU (JADU), in the same handbook, is a unit of no more than 500 square feet of interior livable space, contained entirely within a house. It may have its own bathroom or share one with the house. These are definitions of terms, not a statement of what any lot may have. The state report form has one ADU code and no separate junior code, so the counts on this page cannot be split between the two.

The combined count was higher than the year before in every year except 2020 (849, after 853 in 2019). The 2025 count is 313 above 2024 (21.9%). One gap: the file has no 2019 rows for Hillsborough, so the 2019 figure covers 19 places.

ADUs issued building permits, by year

Units, 20 Silicon Valley cities and towns combined (our sum), reporting years 2018 to 2025 (2019: no Hillsborough rows)

05001,0001,5002,000ADUs issued building permits20182018: 449 units44920192019: 853 units85320202020: 849 units84920212021: 1,248 units1,24820222022: 1,294 units1,29420232023: 1,418 units1,41820242024: 1,428 units1,42820252025: 1,741 units1,741
Show these numbers as a table
ADUs issued building permits
2018449
2019853
2020849
20211,248
20221,294
20231,418
20241,428
20251,741

Source: California Department of Housing and Community Development (HCD).

20 cities and towns combined (our sums). ADU share = ADUs ÷ all units × 100, rounded to one decimal. 2019 has no Hillsborough rows.
Reporting yearADUs issued building permitsAll housing units issued building permitsADU share
20184495,6408.0%
20198535,45915.6%
20208495,32016.0%
20211,2485,26923.7%
20221,2949,28513.9%
20231,4186,46321.9%
20241,4284,21633.9%
20251,7415,77030.2%
2018 to 20259,28047,42219.6%

Source: California Department of Housing and Community Development (HCD).

Property Nerd note. These yearly totals are our sums of the state’s project-level rows, not figures HCD publishes. Each unit is counted once, in the year of its permit date.

02 · ADUs by city

How many ADUs did
each city permit?

San Jose reported 3,337 ADUs over the eight years, 36.0% of the 20-place total. Foster City reported 50.

Palo Alto follows with 741, then Sunnyvale (515), San Mateo (498) and Santa Clara (495). These are raw counts, not adjusted for the size of each place.

In reporting year 2025, San Jose reported 502 ADUs, Santa Clara reported 140 and Palo Alto reported 136. Foster City’s 2018 report is in the file with no ADU dated that year, so it shows as 0. Hillsborough’s 2019 cell is not available, which is different from zero.

ADUs issued building permits, by city

Units, reporting years 2018 to 2025 combined (Hillsborough: seven years)

Show these numbers as a table
ADUs, 2018 to 2025
San Jose3,337
Palo Alto741
Sunnyvale515
San Mateo498
Santa Clara495
Redwood City476
Saratoga467
Los Altos451
Mountain View325
Menlo Park312
Hillsborough268
Los Gatos264
Cupertino240
Los Altos Hills198
Atherton195
Belmont149
Woodside140
Monte Sereno97
Portola Valley62
Foster City50

Source: California Department of Housing and Community Development (HCD).

ADUs issued building permits, by city and reporting year. n/a = the file has no rows for that city and year. The combined row is our sum.
City or town201820192020202120222023202420252018 to 2025
San Jose1924163314204484705585023,337
Palo Alto36624389120127128136741
Sunnyvale30495979595973107515
San Mateo845526882836694498
Santa Clara21514553765455140495
Redwood City2339608183784963476
Saratoga16244366467974119467
Los Altos8362362621096289451
Mountain View615183142705786325
Menlo Park154133656685763312
Hillsborough13n/a225430504356268
Los Gatos1628283635412753264
Cupertino1515194130174459240
Los Altos Hills58254131233530198
Atherton610343225182545195
Belmont912111230212529149
Woodside151691915222321140
Monte Sereno814914181391297
Portola Valley77311210111162
Foster City02234672650
20 places combined4498538491,2481,2941,4181,4281,7419,280

Source: California Department of Housing and Community Development (HCD).

Property Nerd note. Hillsborough’s total of 268 covers seven reporting years, not eight.

03 · ADU share

What share of new housing permits
are ADUs?

Across the 20 places, 9,280 of 47,422 permitted housing units (19.6%) were ADUs. By city, the share runs from 6.7% in Santa Clara to 96.1% in Hillsborough.

In eight of the 20 places, ADUs were more than half of all units issued building permits: Hillsborough, Portola Valley, Woodside, Los Altos Hills, Palo Alto, Saratoga, Monte Sereno and Atherton. In six places the share was under 20%: San Jose, Belmont, Menlo Park, Sunnyvale, Mountain View and Santa Clara.

The share is plain arithmetic: ADUs divided by all permitted units. For the same ADU count, a larger total of other units gives a lower share. San Jose reported 3,337 ADUs among 18,059 permitted units, a share of 18.5%. The share alone does not say why a total is large or small. The full mix by building type is on Silicon Valley new housing permits.

The share also moves by year. For the 20 places combined it was 8.0% in 2018, 13.9% in 2022, when total permits were 9,285, and 30.2% in 2025.

ADUs as a share of all housing units issued building permits

Percent (our calculation), by city, reporting years 2018 to 2025 combined (Hillsborough: seven years)

Show these numbers as a table
ADU share, 2018 to 2025
Hillsborough96.1%
Portola Valley71.3%
Woodside66.4%
Los Altos Hills64.5%
Palo Alto61.8%
Saratoga60.4%
Monte Sereno54.5%
Atherton51.5%
Los Altos45.6%
Cupertino42.0%
Los Gatos33.7%
Foster City31.8%
San Mateo27.4%
Redwood City20.2%
San Jose18.5%
Belmont17.6%
Menlo Park17.6%
Sunnyvale10.4%
Mountain View7.5%
Santa Clara6.7%

Source: California Department of Housing and Community Development (HCD).

Reporting years 2018 to 2025. ADU share = ADUs ÷ all units × 100 (our calculation), rounded to one decimal. Hillsborough has no 2019 rows.
City or townADUs, 2018 to 2025All units, 2018 to 2025ADU shareADUs, 2025All units, 2025
Hillsborough26827996.1%5658
Portola Valley628771.3%1111
Woodside14021166.4%2132
Los Altos Hills19830764.5%3037
Palo Alto7411,19961.8%136174
Saratoga46777360.4%119214
Monte Sereno9717854.5%1216
Atherton19537951.5%4560
Los Altos45198845.6%89247
Cupertino24057242.0%59111
Los Gatos26478433.7%5372
Foster City5015731.8%2626
San Mateo4981,81527.4%94291
Redwood City4762,35820.2%63489
San Jose3,33718,05918.5%5022,629
Belmont14984617.6%2966
Menlo Park3121,77717.6%63102
Sunnyvale5154,93310.4%107216
Mountain View3254,3187.5%86388
Santa Clara4957,4026.7%140531
20 places combined9,28047,42219.6%1,7415,770

Source: California Department of Housing and Community Development (HCD).

Property Nerd note. In Hillsborough, 268 of 279 permitted units were ADUs. In Santa Clara, 495 of 7,402 were.

04 · permit or finished

Is a permitted ADU
a finished ADU?

No. A building permit is permission to start construction. A certificate of occupancy comes at the end.

HCD’s instructions count a unit as permitted when the local government issued its building permit for new housing construction during the reporting calendar year. The same form has a later column for the date a certificate of occupancy, or another form of readiness such as a final inspection, was issued.

We do not publish a count of finished ADUs from that column. It holds what each city entered, and it is incomplete: in 22 of the 159 city-and-year reports behind this page, the file shows ADU permits and no ADU certificate at all. The file cannot tell a true zero from a blank.

The two columns also describe different moments. An ADU permitted in one year may be finished in a later one, and the instructions tell cities to leave the certificate date blank when no certificate was issued in the reporting year.

Property Nerd note. This page counts permits. It gives no count of finished ADUs and no completion rate.

Method

How we measured.

  1. Source. California Department of Housing and Community Development (HCD), Housing Element Annual Progress Report (APR) data, Table A2, on the state open data site: updated November 13, 2026, downloaded November 18, 2026, reporting years 2018 to 2025. Reports are due April 1 for the prior year, so 2025 is the latest full year. Figures are as of November 2026.
  2. Geography. The 20 cities and towns as HCD names them. County rows cover unincorporated areas and are left out. The file has no 2019 rows for Hillsborough, shown as not available, not as zero.
  3. Formula. ADUs for a city and year = the sum of “units issued building permits” over rows coded ADU whose permit date falls in that reporting year. ADU share = ADUs ÷ all units counted the same way × 100, rounded to one decimal for display. Combined figures are our sums of the 20 places.
  4. Why the date rule. A report can hold rows whose permit date falls outside its reporting year. Adding every ADU row gives 10,264 units. The date rule gives 9,280: 944 units sit in rows dated before the reporting year and 40 in rows dated after it.
  5. Certificates. The file also has a column for units issued certificates of occupancy or other forms of readiness. It is what each city reported and it is incomplete (22 of 159 city-and-year reports show ADU permits and no ADU certificate), so we publish no certificate counts and no completion rate.
  6. Cross-check. The city totals and yearly ADU counts here equal the ADU figures on our new housing permits page, which uses the same file and rule.
  7. Limits. The data is self-reported by each city, and HCD states that it does not independently verify it. The form has no separate junior ADU code. The counts do not show the size, type or location of any unit, and say nothing about what a given lot may have.

Questions

Common questions.
Plain answers.

How many ADUs were permitted in Silicon Valley in 2025?

The 20 cities and towns on this page reported building permits for 1,741 ADUs in reporting year 2025, compared with 1,428 in 2024 and 449 in 2018. That is our sum of HCD Annual Progress Report data, Table A2 (file updated November 13, 2026).

What is the difference between an ADU and a junior ADU?

HCD’s ADU Handbook (March 2026) describes an ADU as a separate, complete home, attached or detached, on a lot that has or will have a primary residence. A junior ADU is no more than 500 square feet of interior livable space and sits entirely within a house, and it may share a bathroom with that house. The state permit file has one ADU code and no separate junior code.

How many ADUs has San Jose permitted?

San Jose reported building permits for 3,337 ADUs in reporting years 2018 through 2025, including 502 in 2025. ADUs were 18.5% of the 18,059 housing units the city permitted in that period (file updated November 13, 2026).

Where are ADUs more than half of new housing permits?

In eight of the 20 places: Hillsborough, Portola Valley, Woodside, Los Altos Hills, Palo Alto, Saratoga, Monte Sereno and Atherton. In Hillsborough, 268 of 279 permitted units from 2018 to 2025 were ADUs, a share of 96.1% (file updated November 13, 2026; Hillsborough has no 2019 rows).

Does an ADU permit mean the ADU was built?

No. A permit is permission to start construction. The state file has a separate column for certificates of occupancy, but it holds what each city entered and it is incomplete: in 22 of the 159 city-and-year reports behind this page it shows ADU permits and no ADU certificate. This page gives permit counts, with no count of finished ADUs and no completion rate (file updated November 13, 2026).

Can this page tell me whether a lot can have an ADU?

No. The counts show past permits by city and year, nothing about any one lot. State law and each city’s own ordinance set the rules, and the city’s planning department is the place to ask.

More data

Keep counting.

Every page in Silicon Valley by the Numbers is built from official public data, with the method shown.

Home Price Index

558.75

Silicon Valley Home Price Index

San Jose-Sunnyvale-Santa Clara metro area index (1995 Q1 = 100). 2026 Q2, release of August 2026.

See the data →

Mortgage Rate History

7.11%

Mortgage Rate History

30-year fixed, U.S. average. Week dated November 12, 2026.

See the data →

Housing Stock by City

737,988

Silicon Valley Housing Stock by City

Housing units, 20 cities combined (our sum). January 1, 2026 (provisional).

See the data →

When Homes Were Built

1975

When Silicon Valley Homes Were Built

Median year built, Santa Clara County (±1 year). ACS 2020–2024 5-year estimates, released January 29, 2026.

See the data →

New Housing Permits

47,422

Silicon Valley New Housing Permits

Housing units issued building permits, 20 cities, 2018 to 2025 (our sum). File updated November 13, 2026.

See the data →

Climate by City

74.8–88.8°F

Silicon Valley Climate by City

Normal daily high in each station’s warmest month, eight stations. 1991–2020 normals.

See the data →

Loan limits

$1,249,125

Silicon Valley Conforming Loan Limits

One-unit limit, Santa Clara and San Mateo counties. 2026 limits, announced November 25, 2025.

See the data →

Jobs by Industry

1,119,582

Silicon Valley Jobs by Industry

Jobs at workplaces in Santa Clara County, 2025 annual average. BLS file dated August 21, 2026.

See the data →

Homes by Bedroom Count

29.4%

Silicon Valley Homes by Bedroom Count

Santa Clara County housing units with three bedrooms (±0.4 points). ACS 2020–2024 5-year estimates, released January 29, 2026.

See the data →

Housing Growth

31,552

Silicon Valley Housing Growth by City

Net housing units added in the 20 cities since the 2020 benchmark (our sum). January 1, 2026 (provisional), compared with April 1, 2020. Released May 1, 2026.

See the data →

Home Heating by City

58.5%

Silicon Valley Home Heating by City

Occupied homes heated mainly by utility gas, Santa Clara County (±0.5 points). ACS 2020–2024 5-year estimates, released January 29, 2026.

See the data →

Working From Home by City

23.9%

Working From Home in Silicon Valley, by City

Workers living in Santa Clara County who worked from home (±0.4 points); 5.0% in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.

See the data →

Electric Vehicles and Charging

280,157

Silicon Valley Electric Vehicles and Home Charging

Zero-emission vehicles registered in Santa Clara and San Mateo counties (our sum). Data as of December 31, 2025.

See the data →

Electricity Providers by City

18 of 20

Silicon Valley Electricity Providers by City

Cities and towns where PG&E delivers the electricity. California Energy Commission utility layer, read November 18, 2026.

See the data →

Business Applications

24,043

Silicon Valley New Business Applications

Business applications in Santa Clara County, 2025. Census file released June 10, 2026.

See the data →

Tech Workers by City

24.4%

Silicon Valley Tech Workers by City

Employed Santa Clara County residents in computer, engineering and science occupations (±0.3 points). ACS 2020–2024 5-year estimates, released January 29, 2026.

See the data →

Commute Times by City

26.2 min

Silicon Valley Commute Times by City

Mean one-way trip to work, workers living in Santa Clara County (±0.3 minutes); 29.3 in 2015–2019. ACS 2020–2024 5-year estimates, released January 29, 2026.

See the data →

Your next move

Read the numbers.
Then choose your part of the Valley.

Buying in Silicon Valley

Tell us where you work, how you like to get around and what kind of house you are after. We will help you compare cities and streets with that in mind.

See the buyer advantage ↗ Find your fit ↗

Talk with the Boyenga Team at Compass: (408) 373-1660 or (650) 383-8606, or send us a note.